0:00
Oh boy, check this out. Hi, I'm Tim Carter from AskTheBuilder.com. Thanks for joining me today
0:11
I'm in this room that we're remodeling, and we have to extend a tile floor into this area that's not finished
0:19
Check that out. The reason that happened is just about 10 days ago, right where I'm standing
0:24
there used to be a wall that went all the way to the ceiling. We took it down so that the two rooms
0:28
will now become one. The challenge is this. Check this out. If you go ahead and start
0:35
to lay the tile going this direction behind me and you think that you'll be able to line
0:41
it up with your eye, making sure that the lines are perfect, it's not going to happen
0:46
You'll make a mistake every time. You actually need to create a line on this concrete slab
0:52
that you will actually lay the tile to so that you know that those rows are straight
0:58
And here's one way that I've done it in the past, works pretty well. You can use just a regular chalk line
1:03
This one happens to have no chalk on it yet. If you're going to use one that's already got chalk
1:07
make sure you pull the chalk line out and snap it a couple times to get as much chalk off as possible
1:12
But check this out. Come here. All you have to do is open up the chalk line
1:18
and you hook the chalk line right to the underside of the tile
1:25
You can see right here, I took the end of the chalk line, hooked it to the underside of this tile
1:30
pulled the string tight, and then what I do, now look real closely here
1:36
I go ahead right here and I get the string lined up
1:40
right with that edge of the tile. That's exactly what I want to see right there
1:45
so I know it's right. Then I take the chalk line and I come back down here and what I can do first of all is do this is I can actually use the line the string line and I can see by just hovering it over the edge of this tile that these tiles are
2:08
perfectly in line. That's exactly what we want to see. So now what we'll do is I can make a line right here, right underneath the string line
2:18
on the concrete slab. So we know where that point is. We come back here, and then I line up the string
2:29
looking right down the string, put my eye right over it, and you can see that I can swing the string left and right
2:39
until it's right at the edge of the tile, which it is right there. You can see it right over the edge of the tile
2:46
put the string down here, make a mark, and if you take a heavy object like a full
2:55
paint can, I can set it on the string so now the string won't move, and I can go
3:02
ahead and make marks right underneath the string in a couple of places, and then if
3:09
you want, you can take a straight edge like a four-foot level, connect those
3:16
lines you've got your straight line to start laying your tile. I'm Tim Carter
3:21
for AskTheBuilder.com. If you want to discover more home improvement tips go