I wanted to show you a basement modeling
0:02
job I'm working on at my son's
0:05
house uh this is a uh we just came down
0:09
the steps and this was all open uh there
0:13
was nothing here no walls nothing just
0:16
four steel columns that supported two
0:18
beams that ran down the center of the
0:20
home all right this is a television room
0:23
here uh it's um pretty big I think 14 ft
0:27
by 22 ft um pretty nice going to be a
0:30
big flat screen TV right there some
0:34
shelves below it like cap bookcases this
0:36
is for shelving here this is a bedroom
0:40
uh that's an egress door a room for a
0:43
desk there closet of course uh nothing
0:47
whatsoever uh the ceiling uh these are
0:50
all trust joists this house is only 3
0:52
years old so it was a beautiful basement
0:54
to work in here are the wonderful rental
0:57
electric wall panel heaters they are
1:02
design you walk through here right this
1:06
hallway and this is a storage room it
1:10
could be a home gym we wired it with 20
1:12
amp circuits in case you've got a
1:14
treadmill some other big stuff this is
1:15
the furnace room back here this will be
1:18
unfinished back through the storage
1:22
room and of course here is the uh Speak
1:27
area uh this is a internet closet you
1:30
know all the internet stuff's in there
1:33
uh so there'll be a nice bar top here
1:37
here um this behind me is uh a like a
1:42
wck room it's going to be for game table
1:44
where the drial is will be a table uh
1:47
the tankless water heaters in that
1:49
closet the circuit breaker panels in
1:51
that closet yes when you open the door
1:53
you'll have your 3 ft this is the
1:55
wonderful empathy ceiling suspended
1:58
ceiling system we're putting in it is a
2:00
joy to work with I'm I'm going to record
2:03
next week a very detailed video showing
2:06
how to install it you you this ceiling
2:08
only hangs down an inch and
2:11
3/4 from the trust joist it is amazing
2:15
all right that BL that roix wire it's
2:17
coming out when we're done don't
2:19
worry and of course back here we're
2:22
almost run out of time this is a full
2:25
bathroom um wall hung toilet this shower
2:29
is going to be up on a platform we just
2:31
wanted to set it in to make sure we had
2:32
enough space to get by the duct work we
2:34
we do we only have an inch to spare and
2:37
all of the plumbing is back
2:40
here you can see it the building drain
2:44
exits above the floor that's a back
2:46
below preventer but here's all the
2:49
plumbing so pretty neat project been
2:52
working on it for many months only can
2:54
work on it on Fridays and Saturdays so
2:57
that's why it's taking so long simple as