Q&A / 

Your home is built to Building Code and passes all inspections. Does this mean you have a high-quality finished home? Maybe not. If you have questions regarding quality, arrange to shadow your home inspector when he comes.

READ THE ANSWER »

Advance payment to your contractor only when the work is completed. Make a schedule with a detailed cost breakdown that your builder will help you with at the beginning of the job.

READ THE ANSWER »

Up front planning and job scheduling will help you, your contractor and subcontractors keep your building project running smoothly. Special orders will be spelled out and the delivery time determined up front. Each job listed should specify when it will be done.

READ THE ANSWER »

Allowances in the quote from a contractor cover items not yet selected. Financial woe can result if this budget is exceeded. Your contract should be very specific to avoid overspending projected costs.

READ THE ANSWER »

The costs of building a new home or adding room additions will vary from contractor to contractor. Request a breakdown of the costs. Provide them with a standardized form to help you compare "apples to apples." This will also help you determine if your contractors payment requests are in line.

READ THE ANSWER »

Your heating ductwork is okay. Your furnace and air conditioner are working and are sized correctly, but no air is coming out of some of the heating ducts. Equalized static pressure is important for air flow. As supply pipes are branched off the main supply duct, they should get smaller to provide the correct static pressure.

READ THE ANSWER »

If you want a truly waterproof foundation, use the right products and a good drainage system. Damp proofing products are generally asphalt or tar based compounds sprayed on the foundation. Waterproofing compounds are different from damproofing.

READ THE ANSWER »

SPONSORS /