Master Bath Remodeling
After 15 years, a shower that was starting to leak, and a carpeted master bath, it was time to upgrade the bathroom.
After selecting natural stone floor, shower, and wall tile, custom built cabinetry, and challenging our granite guy to fabricate a top to our existing tub, the pressure was on to build it right.
The granite and glass were done by the pros. Floor tile, plumbing, raising and moving the tub, shower demolition, new shower pan, shower wall and floor tile, fixture installation, and all else was done by the homeowner ... crazy to take on this project with two small children, and a wife who was not raised in a do-it-yourself environment.
Bring it on!
Paul Majcher
All photos submitted by Paul Majcher.
| If you want to submit pictures and the story behind your project, CLICK HERE to go to the Before & After Submission Page. |
Tim built custom homes and did ultra-custom remodeling for 20+ years before launching his Ask the Builder media presence. He was selected as one of the Big 50 by Remodeling magazine in 1993. This award gave birth to Ask the Builder in October 1993. Tim also operates https://DrawPlumbingPlans.com. His @askthebuilder YouTube channel was the first home improvement channel on YouTube.


